10-08-2021, 02:40 PM
(10-08-2021, 02:16 PM)Strawberry Milkshake Wrote: The quote was 630 on a 19.99 per sq MT carpet. Divide that and you get just over 31 sq mt.
I calculate 18 sq mt (rounded up) based on picture.
I just did some crazy rough calcs and got to 32sq m if they're discarding all waste
The main landing in 5.2m
The stairs need (175mm + 250mm)*8 + 1m = 2.7m
If they take them from separate cuts that's 7.9m
On a 4m roll that's 31.6 sq m
But ... I'd have thought the landing and the stairs could be cut from the same piece, as they're less than 4m wide combined.
That should make it 5.2m length needed, or 20.8 sq m
But I'm no expert, just like a maths puzzle!